Automatic Strip Splicing
Enables correct, repeatable splicing of longitudinal strip reels, and at the same time makes the operation less labour intensive. The reels are exchanged approximately every 1.45 hours.
Operator panel
The production is easily managed through a Tetra Pak Operator Panel (TPOP) system on the ground level. All major functions can be initiated and supervised - from production preparation to the Cleaning in Place (CIP) function.
PLMS Centre
The packaging line monitoring system (PLMS) enables tracking of production performance, such as possible stop reasons, efficiencies, waste levels.
Packaging material in-feed
Each unit holds a jumbo reel of packaging material with sufficient supply for just above three hours of production when running at the higher speed, and four hours of production at the lower speed. A jumbo reel holds sufficient material for up to 44,000 packages (Tetra Fino® Aseptic 200 ml).
Fully automatic splicing unit
The splicing unit heats and pressurises the packaging material to automatically make a neat seal between one reel and the next, so package production can continue uninterrupted.
Aseptic system
Consists of a shallow hydrogen peroxide bath, squeegee rollers and a heating chamber. Rollers distribute the hydrogen peroxide evenly; controlled heating and evaporation give effective sterilisation. Control of aseptic parameters ensures product protection and minimises the risk of operator errors.